The Timeline That Matters
Map your automation decisions against your builder's schedule, not against your move-in date.
| Stage | Wired automation | Wireless retrofit | What to do now |
|---|---|---|---|
| Planning / pre-construction | Fully possible — best outcome | Possible | Lock the automation scope before the electrical drawing is frozen |
| Slab & conduit stage | Possible — conduits can still be added | Possible | Add extra conduits, deeper boxes and a network point per room |
| Wiring done, interiors starting | Partly — surface routing may be needed | Fully possible | Coordinate switch-plate locations with your interior designer |
| Ready / possession taken | Rarely worth the civil work | Fully possible | Retrofit modules behind existing switch plates, wireless curtains, smart locks |