Concealed conduits being installed in an under-construction home before automation wiring
    Planning · Article

    When to Plan Home Automation in a New House

    Six months of lead time turns a smart home from an add-on into part of the architecture. Here is the timeline, stage by stage.

    Quick answer

    Decide your home automation scope at the conduit stage — after the slab, before the electrician pulls wires. Practically, that is 4–8 months before possession. The three decisions that must be made in that window are neutral wires at every switch point, circuit splitting for lighting scenes, and one network point per room.

    The Timeline That Matters

    Map your automation decisions against your builder's schedule, not against your move-in date.

    What is still possible at each stage of your new home
    StageWired automationWireless retrofitWhat to do now
    Planning / pre-constructionFully possible — best outcomePossibleLock the automation scope before the electrical drawing is frozen
    Slab & conduit stagePossible — conduits can still be addedPossibleAdd extra conduits, deeper boxes and a network point per room
    Wiring done, interiors startingPartly — surface routing may be neededFully possibleCoordinate switch-plate locations with your interior designer
    Ready / possession takenRarely worth the civil workFully possibleRetrofit modules behind existing switch plates, wireless curtains, smart locks

    The Three Decisions You Cannot Postpone

    Everything else in a smart home can be added later. These three cannot be added cheaply once the walls are closed.

    1. Neutral wire at every switch point

    Almost every smart switch and dimmer needs a neutral. Adding it later means chasing the wall from the switch box back to the distribution board — the single most common retrofit blocker in Indian homes.

    2. Circuit splitting for scenes

    A 'Movie' scene means cove lights dim, spots go off and the TV wall stays lit. That is only possible if those lights are on separate circuits. If your electrician wires the whole living room on two circuits, no amount of software fixes it.

    3. One network point per room

    A CAT6 run to each room costs a few thousand rupees at conduit stage and enables access points, cameras, TVs and wired hubs for the next twenty years.

    What You Can Safely Decide Later

    Do not let vendors rush you into buying hardware early. Panels, hubs, cameras and speakers all get better and cheaper. Lock the infrastructure now, choose the devices at the finishing stage.

    • Brand and model of switches, panels and hubs
    • Curtain fabric and motor selection
    • Camera count and placement
    • Multi-room audio and home theatre scope

    Already Late? Here Is What Still Works

    If your wiring is done or you have already moved in, wireless retrofit covers lighting, fans, curtains, climate, locks and cameras with no civil work. Read the apartment retrofit guide for scope and costs.

    Get a Stage-Wise Plan

    Tell us your property type and where you are in the build — planning, under construction, interiors or possession. We'll send a room-by-room automation plan with an indicative budget. Free, no obligation.

    1. Property type
    2. Configuration
    3. Which stage are you in?
    4. What do you want automated?
    5. Where should we send the plan?

    No spam. We use your number only to discuss your automation plan.

    Experience Centre · Hyderabad

    Visit our Hyderabad showroom

    Book a free demo at the LiveInSmart Hyderabad Experience Centre — listen to Dolby Atmos, see 4K laser projectors and walk through live home-automation scenes before you buy.

    Pancom Business Centre, Mumbai Hwy, Nagarjuna Nagar Colony, Ameerpet, Hyderabad 500073

    Frequently Asked Questions

    How many months before possession should I plan automation?+

    Four to eight months. That usually puts you at the conduit or pre-wiring stage, where circuit and cabling decisions are still free to make.

    My builder says automation is not allowed. What now?+

    Many builders restrict changes to their standard electrical package but allow customer-specified additions during fit-out. Ask specifically for neutral wires, deeper switch boxes and network conduits — these are rarely refused.

    Do I need to choose brands before wiring?+

    No. Infrastructure decisions are brand-agnostic. Choose neutral wiring, circuit splitting and networking now; choose devices at the finishing stage.